Making it Happen - The Tunnel - Gallery Page 3

Photo #00037

Worker using diamond drill / Power Operations, Alcan Primary Metal B.C. -- March 31, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

An unidentified worker using a diamond drill set-up in Slot No. 1.

Photo #00039

Mucking at the face / Power Operations, Alcan Primary Metal B.C. -- May 28, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers mucking a face inside the tunnel at Station 28 plus 75 at West Tahtsa.

Photo #00041

Afternoon shift / Power Operations, Alcan Primary Metal B.C. -- June 25, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers from the afternoon shift exiting the Horetzky adit.

Photo #00042

Tunnel intake forms / Power Operations, Alcan Primary Metal B.C. -- November 22, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Two forms for the transition section at the intake.

Contact Us
Facebook