Making it Happen - The Tunnel - Gallery Page 4

Photo #00029

West Tastsa Lake School / Power Operations, Alcan Primary Metal B.C. -- November 24, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Students sitting at their desks in class at West Tahtsa Lake School. Smaller students join the teacher at the chalkboard. A cat beside them is peering out the window.

Photo #00040

Drilling off the face / Power Operations, Alcan Primary Metal B.C. -- November 24, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers drilling off another round at the tunnel face.

Photo #00043

Enlarging the valve chamber / Power Operations, Alcan Primary Metal B.C. -- January 26, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers inside the tunnel, enlarging the valve chamber for the No. 1 penstock on the 2600' level.

Photo #00044

Swing shift world record / Power Operations, Alcan Primary Metal B.C. -- February 25, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

The world record setting swing shift miners at the Horetzky-Kemano heading, posing on the Copco drill set-up with a sign that gives specifics to their record.

Contact Us
Facebook