Making it Happen - The Tunnel - Gallery Page 6

Photo #00047

Drilling on skip jumbo / Power Operations, Alcan Primary Metal B.C. -- May 16, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Miners drilling on the skip jumbo in the No. 1 penstock 900' below the 2600' level.

Photo #00052

Welding penstock liner / Power Operations, Alcan Primary Metal B.C. -- August 25, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Two welders, welding the penstock liner elbow section to the 1600' level.

Photo #00046

Men in material skip / Power Operations, Alcan Primary Metal B.C. -- September 29, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Four men inside a material skip from 2600' level going to the top of the surge shaft area.

Photo #00038

Drill doctor's shop / Power Operations, Alcan Primary Metal B.C. -- October 01, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Three men inside the underground drill doctor's shop.