Making it Happen - The Tunnel - Gallery Page 9

Photo #00062

New stairway at Camp No. 2600 / Power Operations, Alcan Primary Metal B.C. -- June 17, 1955. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

The new stairway leading up a bank to crew quarters at Camp No. 2600.

Photo #00058

Penstock No. 2 miners / Power Operations, Alcan Primary Metal B.C. -- July 14, 1955. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Miners on the jumbo, holding drills used to drill holes for dowels for support of skid rails in raise.

Photo #00063

Tramway carrying liner for penstock No. 2 / Power Operations, Alcan Primary Metal B.C. -- October 01, 1955. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

A worker watching as a 19-ton horizontal penstock liner is transported on an aerial tramway from Camp No. 5 to Camp No. 1600.

Photo #00061

Prepakt aggregate conveyor / Power Operations, Alcan Primary Metal B.C. -- October 29, 1955. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

The Prepakt aggregate conveyor in foreground during operations at elbow (seen in distance), Elevation 210'. View is looking upstream along No. 2 penstock.

Contact Us
Facebook