Making it Happen - Transmission Line - Gallery Page 3

Photo #00123

Engineers spotting anchor bolt holes / Power Operations, Alcan Primary Metal B.C. -- August 12, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Morrison-Knudsen Company engineers spotting anchor bolt holes for Tower No. 114R.

Photo #00116

Camp No. 10 / Power Operations, Alcan Primary Metal B.C. -- September 20, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

The area between Twin Peaks and Pass Summit showing Camp No. 10, the concrete batching plant and several of the tower sites. View from Twin Peaks.

Photo #00122

Aggregate and batch plant / Power Operations, Alcan Primary Metal B.C. -- October 04, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

The aggregate and batch plant, which supplied the concrete for the large combined footings.

Photo #00124

Tower No. 242 bottom forms / Power Operations, Alcan Primary Metal B.C. -- October 24, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers setting the bottom forms for the footings of Tower No. 242.