Making it Happen - Transmission Line - Gallery Page 4

Photo #00125

Dala River Bridge / Power Operations, Alcan Primary Metal B.C. -- October 24, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

A jeep crossing the five-span Dala River Bridge. View is looking south-east.

Photo #00111

Stringing Falcon conductors for transmission line / Power Operations, Alcan Primary Metal B.C. -- November 25, 1952. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers stringing Falcon conductors between towers No. 25 and 26 in the Kemano Valley. View is looking north.

Photo #00104

Workers on transmission tower -- ca. 1953. (Alcan Collection)

Two workers standing without the use of safety lines atop a transmission tower in the "R" line during its construction on Kildala Pass.

Photo #00112

Camp 8 preparation / Power Operations, Alcan Primary Metal B.C. -- April 08, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Bull cooks preparing Camp No. 8 for occupancy. Twin Peaks is in the background.