Making it Happen - Transmission Line - Gallery Page 6

Photo #00103

Tower No. 113L / Power Operations, Alcan Primary Metal B.C. -- September 04, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Workers piecing together the leg sections of Tower No. 113L by hand-winching them to height, then bolting them together on the inside.

Photo #00106

Workers standing on Tower No. 112L / Power Operations, Alcan Primary Metal B.C. -- September 04, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Two workers standing atop Tower No. 112L. Towers No. 108R and 108L can also be seen. Twin Peaks Summits are in the background.

Photo #00115

Twin Peaks Camp / Power Operations, Alcan Primary Metal B.C. -- October 05, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

Twin Peaks Camp and towers No. 108R and 108L, as seen from tower No. 109L, looking south towards Kemano powerhouse.

Photo #00102

Erecting truss for transmission line tower / Power Operations, Alcan Primary Metal B.C. -- October 16, 1953. (Alcan Collection) Power Operations, Alcan Primary Metal B.C.

A truss being erected for the transmission line tower in the switchyard. Powell Peak is in the background. View is looking north-west.